Metal Shop: Difference between revisions
Jump to navigation
Jump to search
(Create TODO table) |
(Add coloring to min-viability items) |
||
Line 14: | Line 14: | ||
|- | |- | ||
|rowspan="2"|Walls | |rowspan="2"|Walls | ||
|Framing + Drywalling || Minimum Viability | |Framing + Drywalling | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
|- | |- | ||
|Mudding + Painting || Minimum Viability | |Mudding + Painting | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
| Do before Elec. & Air lines | |||
|- | |- | ||
|rowspan="4"|Doors | |rowspan="4"|Doors | ||
Line 35: | Line 38: | ||
|Security Camera || High || Improved 1/4-20 pivoting mount for IP cam | |Security Camera || High || Improved 1/4-20 pivoting mount for IP cam | ||
|- | |- | ||
|Emergency Response || Minimum Viability | |Emergency Response | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
| Fire extinguisher, first aid | |||
|- | |- | ||
!colspan="4"|Utilities | !colspan="4"|Utilities | ||
Line 51: | Line 56: | ||
|- | |- | ||
|rowspan="4"| Compressed Air | |rowspan="4"| Compressed Air | ||
|Compressor placement || Minimum Viability | |Compressor placement | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
| Needs 240V Access | |||
|- | |- | ||
|Distribution air dryer || Minimum Viability | |Distribution air dryer | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
| Only distribute clean air throughout metalshop (no water or oil) | |||
|- | |- | ||
|Compressor enclosure || Low || Enclose compressor for sound isolation | |Compressor enclosure || Low || Enclose compressor for sound isolation | ||
Line 64: | Line 73: | ||
|- | |- | ||
|rowspan="1"| Cleaning supplies | |rowspan="1"| Cleaning supplies | ||
|Broom & Dustpan stations || Minimum Viability | |Broom & Dustpan stations | ||
|style="background-color:#f1c0fc"| Minimum Viability | |||
| At least 2 broom+dustpan stations for chip cleanup | |||
|- | |- | ||
|rowspan="2"|Tool Organization | |rowspan="2"|Tool Organization |
Revision as of 21:30, 18 October 2022
The Metalshop is currently (October 2022) undergoing a MASSIVE reorganization effort to improve:
- Productivity
- Cleanliness
- Safety
And will be out of commission until we complete all TODO items of minimum viability. Fortunately, YOU CAN HELP!
Security | |||
---|---|---|---|
Category | Item | Priority | Notes |
Walls | Framing + Drywalling | Minimum Viability | |
Mudding + Painting | Minimum Viability | Do before Elec. & Air lines | |
Doors | Autoshop exit | High | |
Central space exit | High | ||
Back bay exit | High | ||
Fadal Barn Door | High | Sliding(pocket?) door for rear access to the Fadal VMC | |
Access control | Shop Access Control | Medium | Keyfob door locks |
Machine Access Control | Low | Power interlocks (code or keyfob) | |
Safety | Security Camera | High | Improved 1/4-20 pivoting mount for IP cam |
Emergency Response | Minimum Viability | Fire extinguisher, first aid | |
Utilities | |||
Category | Item | Priority | Notes |
Power | North wall distribution | High | 240V and 120V, Possibly individual circuit for the Fadal |
Private breaker panel | Medium | Possibility of Metalshop having its own breaker panel? | |
Welding cells | High | 240V receptacles in each cell, 120V? | |
Work Table Reel | Medium | Retractable cable-reel above big metal table | |
Compressed Air | Compressor placement | Minimum Viability | Needs 240V Access |
Distribution air dryer | Minimum Viability | Only distribute clean air throughout metalshop (no water or oil) | |
Compressor enclosure | Low | Enclose compressor for sound isolation | |
North Wall Distribution | High | Hard airline ran along walls, ports for cleanoff hoses at each machine | |
Tools | |||
Category | Item | Priority | Notes |
Cleaning supplies | Broom & Dustpan stations | Minimum Viability | At least 2 broom+dustpan stations for chip cleanup |
Tool Organization | Angle Grinders | High | Attach guards & handles, build hanging rack |
Tooling | Low | Sort first into {drills, taps, reamers, mills}, sort each by size |
Contributing to the Metalshop
Fall 2022 Reorg: take ownership of a TODO Item! Post in the slack and a shop captain will give you the details!
Being a member of a makerspace means you are obligated to make-YOUR-space: everyone is responsible for upkeep and improvement.
- Sweep your area + 10 feet
- Check that tools are in proper place
- Sort stock
Equipment