Facilities
Ballasts for main shop: basic 12 electronic ballast b260iunvhp
Dumpster get emptied every Wednesday night/Thursday morning, trash must be within dumpster and lids must be closed (closable)
Main AC System needs filters changed once/quarter: (need to be specified, in Financial Channel on Slack)
Info to be added and private channel for security technologies
Electrical Info
Breaker | Description |
---|---|
Woodshop | |
P1-19 | outlet for dust collector and ceramics wall outlets |
P1-22,24,26 | table saw |
MPD-24,26 | North 4 pack outlet |
MDP-28 | red wire ceiling |
MDP-32 | black wire ceiling |
MDP-36 | blue wire ceiling |
MPD-39 | wood shop ceiling wire nuts |
Metalshop | |
P1-2,4,6 | future welding |
P1-10 | metal ceiling drop blue extension cord |
P1-12 | east 4 pack outlet |
P1-33 | metal 120V from ceiling octopus |
P1-34,37,38 | No 1 cord is red plug, center weld station |
P1-35,37 | future welding |
P1-40,42 | compressor welder, east wall big box |
Ceramics | |
P1-5 | ceramics plug |
P1-9 | heater ceramics, plug in ceramics right of bay door |
P1-13 | lights metal & ceramics |
P1-15 | ceramics ceiling drop |
P1-19 | wood shop and ceramics outlets |
P1-21,23,25 | new run for kiln, 3 phase, N box, 100A |
P1-39,41 | ceramics kiln |
Other | |
P1-1,3 | |
P1-6 | breaker box outlet |
P1-7 | |
P1-8 | |
P1-14,16 | near breaker box |
P1-11 | |
P1-17 | |
P1-18 | |
P1-20 | |
P1-27,29,31 | unoccupied |
P1-28,30 |