Facilities: Difference between revisions

From Make Nashville Wiki
Jump to navigation Jump to search
(Created page with "Ballasts for main shop: basic 12 electronic ballast b260iunvhp Dumpster get emptied every Wednesday night/Thursday morning, trash must be within dumpster and lids must be clo...")
 
(Force column width)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:


Info to be added and private channel for security technologies
Info to be added and private channel for security technologies
== Electrical Info ==
{| class="wikitable"
|+ Breaker Table
! scope="col" style="width:8em"| Breaker
! scope="col" | Description
|- style="text-align:center"
| colspan="2" | Woodshop
|-
|P1-19 || outlet for dust collector and ceramics wall outlets
|-
|P1-22,24,26 || table saw
|-
|MPD-24,26 || North 4 pack outlet
|-
|MDP-28 || red wire ceiling
|-
|MDP-32 || black wire ceiling
|-
|MDP-36 || blue wire ceiling
|-
|MPD-39 || wood shop ceiling wire nuts
|- style="text-align:center"
| colspan="2" | Metalshop
|-
|P1-2,4,6 || future welding
|-
|P1-10 || metal ceiling drop blue extension cord
|-
|P1-12 || east 4 pack outlet
|-
|P1-33 || metal 120V from ceiling octopus
|-
|P1-34,37,38 || No 1 cord is red plug, center weld station
|-
|P1-35,37 || future welding
|-
|P1-40,42 || compressor welder, east wall big box
|- style="text-align:center"
| colspan="2" | Ceramics
|-
|P1-5 || ceramics plug
|-
|P1-9 || heater ceramics, plug in ceramics right of bay door
|-
|P1-13 || lights metal & ceramics
|-
|P1-15 || ceramics ceiling drop
|-
|P1-19 || wood shop and ceramics outlets
|-
|P1-21,23,25 || new run for kiln, 3 phase, N box, 100A
|-
|P1-39,41 || ceramics kiln
|- style="text-align:center"
| colspan="2" | Other
|-
|P1-1,3 ||
|-
|P1-6 || breaker box outlet
|-
|P1-7 ||
|-
|P1-8 ||
|-
|P1-14,16 || near breaker box
|-
|P1-11 ||
|-
|P1-17 ||
|-
|P1-18 ||
|-
|P1-20 ||
|-
|P1-27,29,31 || unoccupied
|-
|P1-28,30 ||
|-
|}

Latest revision as of 17:06, 19 October 2022

Ballasts for main shop: basic 12 electronic ballast b260iunvhp

Dumpster get emptied every Wednesday night/Thursday morning, trash must be within dumpster and lids must be closed (closable)

Main AC System needs filters changed once/quarter: (need to be specified, in Financial Channel on Slack)

Info to be added and private channel for security technologies

Electrical Info

Breaker Table
Breaker Description
Woodshop
P1-19 outlet for dust collector and ceramics wall outlets
P1-22,24,26 table saw
MPD-24,26 North 4 pack outlet
MDP-28 red wire ceiling
MDP-32 black wire ceiling
MDP-36 blue wire ceiling
MPD-39 wood shop ceiling wire nuts
Metalshop
P1-2,4,6 future welding
P1-10 metal ceiling drop blue extension cord
P1-12 east 4 pack outlet
P1-33 metal 120V from ceiling octopus
P1-34,37,38 No 1 cord is red plug, center weld station
P1-35,37 future welding
P1-40,42 compressor welder, east wall big box
Ceramics
P1-5 ceramics plug
P1-9 heater ceramics, plug in ceramics right of bay door
P1-13 lights metal & ceramics
P1-15 ceramics ceiling drop
P1-19 wood shop and ceramics outlets
P1-21,23,25 new run for kiln, 3 phase, N box, 100A
P1-39,41 ceramics kiln
Other
P1-1,3
P1-6 breaker box outlet
P1-7
P1-8
P1-14,16 near breaker box
P1-11
P1-17
P1-18
P1-20
P1-27,29,31 unoccupied
P1-28,30