Ballasts for main shop: basic 12 electronic ballast b260iunvhp

Dumpster get emptied every Wednesday night/Thursday morning, trash must be within dumpster and lids must be closed (closable)

Main AC System needs filters changed once/quarter: (need to be specified, in Financial Channel on Slack)

Info to be added and private channel for security technologies

Electrical Info

Breaker Table
Breaker Description
Woodshop
P1-19 outlet for dust collector and ceramics wall outlets
P1-22,24,26 table saw
MPD-24,26 North 4 pack outlet
MDP-28 red wire ceiling
MDP-32 black wire ceiling
MDP-36 blue wire ceiling
MPD-39 wood shop ceiling wire nuts
Metalshop
P1-2,4,6 future welding
P1-10 metal ceiling drop blue extension cord
P1-12 east 4 pack outlet
P1-33 metal 120V from ceiling octopus
P1-34,37,38 No 1 cord is red plug, center weld station
P1-35,37 future welding
P1-40,42 compressor welder, east wall big box
Ceramics
P1-5 ceramics plug
P1-9 heater ceramics, plug in ceramics right of bay door
P1-13 lights metal & ceramics
P1-15 ceramics ceiling drop
P1-19 wood shop and ceramics outlets
P1-21,23,25 new run for kiln, 3 phase, N box, 100A
P1-39,41 ceramics kiln
Other
P1-1,3
P1-6 breaker box outlet
P1-7
P1-8
P1-14,16 near breaker box
P1-11
P1-17
P1-18
P1-20
P1-27,29,31 unoccupied
P1-28,30